Projects
Resources & Reserves
In May 2023, the Company released an updated Mineral Resource for the Cape Ray Gold Project, in accordance with the JORC-2012 Code.
2023 Mineral Resource Estimate | ||||
Cut-off Grade g/t Au | Tonnes Mt | Grade g/t Au | Contained Metal koz Au | |
Open pit – total indicated & inferred mineral resources | ||||
Central Zone | 0.30 | 4.2 | 2.82 | 377 |
Window Glass Hill | 0.30 | 4.5 | 0.96 | 140 |
Isle Aux Morts | 0.30 | 0.5 | 2.35 | 35 |
Big Pond | 0.30 | 0.1 | 3.01 | 9 |
TOTAL OPEN PIT | 0.30 | 9.3 | 1.88 | 560 |
Underground – total indicated & inferred mineral resources | ||||
Central Zone | 2.00 | 0.4 | 3.80 | 49 |
TOTAL UNDERGROUND | 2.00 | 0.4 | 3.80 | 49 |
Overall – total indicated & inferred mineral resources | ||||
Total Resources | 9.7 | 1.96 | 610 |
Mineral Resource Notes
- Mineral Resources are reported using a cut-off grade of 0.30 g/t gold for open pit and 2.00 g/t gold for underground, and a gold price of US$1750 based on the assumptions presented in Appendix 1 -Section 3 – Mining Factors or Assumptions (refer ASX Announcement 30 May 2023).
- The open pit Mineral Resource is constrained using an optimised pit that has been generated using Lerchs Grossman algorithm with parameters outlined in in Appendix 1 -Section 3 – Mining Factors or Assumptions (refer ASX Announcement 30 May 2023).
- The underground Mineral Resources are constrained using a 2.00 g/t gold grade shell below the optimised pit based on the assumptions summarised in Appendix 1 -Section 3 – Mining Factors or Assumptions (refer ASX Announcement 30 May 2023).
- The Mineral Resource Statement for the Cape Ray Gold Project has been prepared by Trevor Rabb, P.Geo. who is a Competent Person as defined by JORC (2012).
- Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.
- The Mineral Resources for the Cape Ray Gold Project has been prepared in accordance with JORC (2012)
- The number of metric tonnes and contained gold ounces are rounded to the nearest thousand. Any discrepancies in the totals are due to rounding.
- Mineral Resources for the Cape Ray Gold Project have an effective date of 22 February 2023.
- For further information, refer to the ASX Announcement dated 30 May 2023.